If you are not sure how much soil you will need for the job measure the length x width x Depth = Total required
10mtrs x 6mts x
0.05mm (50mm) = 3m3

Coverage for
Stone and Mulches
(These figures are
approximate only)
Sand, Rainbow Stone,
Pea Gravel, Crushed
Brick, Blue Metal,
Limestone Fines
= 1m3 @ 100mm Thick
= 10m2
= 1m3 @75mm Thick =
13m2
= 1m3 @50mm Thick =
20m2
Mulches:
= 1m3 @100mm
Thick = 10m2
=1m3 @75mm Thick =
13m2
1 Trailer Load = 0.7
Cubic Metres (Approx)
1 Cubic Metre = 1
1/2 Trailer Loads (Approx)
eg: 3 Trailer Loads
= 2 Cubic Metres |